He additional that Period two would address the extend with the Lekki second toll gate towards the Ajah below-bridge and can be divided into four sections. “Motorists from Ajah inward Lekki is going to be diverted to 1 lane although repairs are ongoing on one other lane,” Osiyemi said. “When https://steeler864nsv7.blogdomago.com/profile