As noticed within the figure below, constant auger is used to drill the borehole, raise up drilled soil, and pour concrete though the auger is moved up. Due to this fact, the borehole won't need casing or hydrostatic force to stop harm to the borehole wall. The construction approach includes https://cast-in-situ-piles-in-ban50146.life3dblog.com/31856869/the-greatest-guide-to-cast-in-situ-piles-in-bangladesh